<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Ambijent - RST</title>
	<atom:link href="https://ambijent.hr/en/feed/" rel="self" type="application/rss+xml" />
	<link>https://ambijent.hr</link>
	<description>Dobrodošli!</description>
	<lastBuildDate>Sun, 23 May 2021 02:43:35 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.6</generator>
		<item>
		<title>The Lepoglava project met high EU standards</title>
		<link>https://ambijent.hr/en/the-lepoglava-project-met-high-eu-standards/</link>
		<comments>https://ambijent.hr/en/the-lepoglava-project-met-high-eu-standards/#comments</comments>
		<pubDate>Sat, 14 Jun 2014 14:02:14 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Uncategorized @en]]></category>

		<guid isPermaLink="false">http://ambijent.hr/projekt-lepoglave-zadovoljio-visoke-eu-standarde-2/</guid>
		<description><![CDATA[We finalized the architectural design of the Technology Center &#8211; Wood Industry of Lepoglava that met high standards of the European Union. Funded by the Ministry of Regional Development and European funds. Project size is about 5500 square meters that include an office area with space for administration and marketing, design department, conference and laboratory]]></description>
				<content:encoded><![CDATA[<p align="justify">We finalized the architectural design of the Technology Center &#8211; Wood Industry of Lepoglava that met high standards of the European Union.</p>
<p><span id="more-729"></span></p>
<blockquote>
<p align="justify">Funded by the Ministry of Regional Development and European funds.</p>
</blockquote>
<p align="justify">Project size is about 5500 square meters that include an office area with space for administration and marketing, design department, conference and laboratory space, workshop, storage and drying facilities.</p>
<blockquote>
<p align="justify">Solar converters on roof surfaces will ensure the use of renewable energy sources.</p>
</blockquote>
<p align="justify">Heating and cooling with enhanced thermal protection will provide very low power consumption.</p>
<p align="justify">The project was presented to the wood-technology conference in Opatija. More information in croatian language is available on the <a href="http://www.evarazdin.hr/lepoglavski-tehnoloski-centar-drvne-industrije-predstavljen-u-opatiji/" target="_blank"><span style="font-family: Verdana; font-size: medium;">following link</span></a>.</p>
]]></content:encoded>
			<wfw:commentRss>https://ambijent.hr/en/the-lepoglava-project-met-high-eu-standards/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Guide to construction process</title>
		<link>https://ambijent.hr/en/guide-to-construction-process/</link>
		<comments>https://ambijent.hr/en/guide-to-construction-process/#comments</comments>
		<pubDate>Wed, 02 Oct 2013 16:29:08 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Uncategorized @en]]></category>

		<guid isPermaLink="false">http://ambijent.hr/vodic-kroz-gradnju-2/</guid>
		<description><![CDATA[Od projekta do objekta ...

Gradnja je prilično složen i kompleksan postupak u kojem se investitor susreće s velikim brojem zakona i propisa kojih se treba pridržavati da bi se određeni projekt uspješno realizirao i građevina stavila u uporabu.

Ukoliko investitor nije kvalitetno i pravodobno upoznat sa svim propisima i sudionicima u gradnji često dolazi do neočekivanih i neugodnih situacija koje otežavaju i produljuju gradnju, a samim tim i poskupljuju cjelokupni projekt. Stoga je prije samog početka gradnje potrebno ishoditi odgovarajuće dozvole, sve neophodne suglasnosti i u proces uključiti kvalitetne stručne ljude. Radi lakšeg snalaženja u samom procesu gradnje donosimo Vam kratak pregled najznačajnijih poglavlja radi lakšeg snalaženja u cijelom procesu gradnje.]]></description>
				<content:encoded><![CDATA[<p align="justify">The construction is quite complex and complicated process in which the client or investor are faced with large number of laws and regulations that need to be followed in order for certain project to be successfully implemented and for certain building to be put into use.</p>
<p><span id="more-492"></span></p>
<p><span style="font-family: Verdana; font-size: large;"><br />
From project to object&#8230;<br />
</span></p>
<p align="justify">If the client or investor are not properly informed with all regulations and the parties involved, that often may lead to unexpected and unpleasant situations that aggravate and prolong the building process, and thus the cost of the overall project is increased.</p>
<p><span style="font-family: Verdana; font-size: medium;">Therefore prior to the start of construction, it is necessary to obtain the proper permits, all necessary approvals and include high-quality professionals into the process. </span></p>
<p align="justify">For easier understanding of the construction process in Croatia, we bring you a brief overview of the most important chapters.</p>
<p>&nbsp;</p></blockquote>
<ul>
<ul>
<li><span style="font-family: Verdana; font-size: large; color: #ff0000;"><strong>What&#8217;s construction?<br />
</strong></span></p>
<blockquote>
<p align="justify">The term implies all the construction phases of the emerging structure through its design, construction, supervision, maintenance, reconstruction and its removal. During each of these phases, it is necessary to take into account the specific legal regulations.</p>
</blockquote>
</li>
<li><span style="font-family: Verdana; font-size: large; color: #ff0000;"><strong>Who are the participants in the construction process?<br />
</strong></span></li>
</ul>
</ul>
<blockquote><p>- investor or client (legal or physical person)<br />
- designer (architect authorized for design)<br />
- auditor (certified engineer or architect who controls the project)<br />
- contractor (person registered to perform the construction)<br />
- supervisor (the person authorized to conduct the technical supervision of construction, which is conducted on behalf of the investor)</p></blockquote>
<ul>
<ul>
<li><span style="font-family: Verdana; font-size: large; color: #ff0000;"><strong>What types of projects are required for construction?<br />
</strong></span></li>
</ul>
</ul>
<blockquote><p>- conceptual design (required for location permit)<br />
- master design (required for obtaining a building permit)<br />
- detailed design (all technical solutions outlined in detail )</p></blockquote>
<ul>
<ul>
<li><span style="font-family: Verdana; font-size: large; color: #ff0000;"><strong>What is a building permit?<br />
</strong></span></li>
</ul>
</ul>
<blockquote>
<p align="justify">A building permit is a document (administrative decision-solution) which legally allows the construction of the building. It determines that the conceptual and master design are performed in accordance with the legal regulations and conditions for particular location are met.</p>
</blockquote>
<ul>
<ul>
<li><span style="font-family: Verdana; font-size: large; color: #ff0000;"><strong>Who issues the building permit?<br />
</strong></span></li>
</ul>
</ul>
<blockquote>
<p align="justify">Building permit is issued by the state administration office in the county or city office. If the construction law or special act doesn&#8217;t specify otherwise, they are in charge of construction in the area where ​​the building is built.</p>
</blockquote>
<ul>
<ul>
<li><span style="font-family: Verdana; font-size: large; color: #ff0000;"><strong>Who applies for the building permit?<br />
</strong></span></li>
</ul>
</ul>
<blockquote>
<p align="justify">An application for a building permit needs to be submitted by the client.</p>
</blockquote>
<ul>
<ul>
<li><span style="font-family: Verdana; font-size: large; color: #ff0000;"><strong>What client needs to submit for issuance of the building permit for a residential building?<br />
</strong></span></li>
</ul>
</ul>
<blockquote><p>- Proof that client has the right to build on a certain property (land registry certificate)<br />
- master design &#8211; 4 copies verified by a licensed architect<br />
- Validity confirmation<br />
- List of parties</p></blockquote>
<ul>
<ul>
<li><span style="font-family: Verdana; font-size: large; color: #ff0000;"><strong>Which certificates should be attached to master design documentation for a residential building?<br />
</strong></span></li>
</ul>
</ul>
<blockquote><p>
- Possibility to connect to the low voltage network (issued by the Croatian electricity company &#8211; HEP)<br />
- Possibility to connect to the telecommunications network (issued by the Croatian telecommunications &#8211; HT)<br />
- Possibility to connect to the utility installations (water, sewer, gas and steam tube; issued by the utility company)<br />
- Permission from the competent state authority in charge of the protection of cultural monuments, in case if the residential building is built in the protected cultural area</p></blockquote>
<ul>
<ul>
<li><span style="font-family: Verdana; font-size: large; color: #ff0000;"><strong>What determines the authority issuing the construction permit and how it verifies it?<br />
</strong></span></li>
</ul>
</ul>
<blockquote>
<p align="justify">Construction permit confirms that the master and conceptual design documentation are made in accordance with the regulations and legal conditions which are needed to be met by building in a particular location. The master design documentation is attached as an integral part of building permits and it must be specified and verified with signature and official seal of the authority that issued the building permit. The construction is not possible to start before the fulfillment of the above conditions</p>
</blockquote>
<ul>
<ul>
<li><span style="font-family: Verdana; font-size: large; color: #ff0000;"><strong>When the constructed building can be put in use?<br />
</strong></span></li>
</ul>
</ul>
<blockquote>
<p align="justify">Constructed building can be put in use after the issuance of usage permit. It is issued by the public authority that has issued the building permit after the technical inspection.</p>
</blockquote>
<p>&nbsp;</p>
<p align="justify">You can find more information on official website of the <a href="http://www.mgipu.hr/default.aspx?id=9637" target="_blank"><span style="font-family: Verdana; font-size: medium;">Croatian ministry of construction and spatial planning</span></a>, but in case you have any questions, please do not hesitate to contact us.</p>
]]></content:encoded>
			<wfw:commentRss>https://ambijent.hr/en/guide-to-construction-process/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
